REAL-TIME DIGITAL SIMULATOR FOR FRESH SHP PLANT ENGINEERS

 

 Course Duration: 6 days

 Objectives

This Real-Time Digital Simulator (RTDS) based training course provides working knowledge of operation and maintenance of SHP plants. This course also focuses on gates & valves, turbine, generator & auxiliaries and turbine generator control of SHP plants. Trainees shall be exposed with various operating scenarios with care on safety and incident free working of the plants.

 Course Contents:

General:

  • Types of hydro power plant and their layout
  • Oil pressure unit working
  • Generator bearing working / monitoring
  • Speed increaser working monitoring
  • Turbine bearing cooling water arrangement
  • Butter fly valves, turbine oiling greasing
  • Plant day today shift work
  • Plant safety and fire-fighting

Plant control room operation from hard panel:

  • Plant panel metering, indicating, operating switches and annunciator
  • Plant start-up and synchronizing procedure
  • Plant load pick up and drop
  • Plant normal, special and emergency shutdown
  • Plant equipment condition monitoring

 Target Participants:

     Fresh SHP Plant Engineers

 