About Us

   Academics /

   Activities

   Achievements/

   Recognitions

   Advisory Support
   Testing
   Facilities
   People

   Publications /

   Downloads

   Internship
   SHP Stations
   RuTAG
   Alumni
   Ar.P-SHP
   Water for Welfare
   Archives
   Links
   Photo Gallery
   Contact Us


Model DPRs

MODEL DETAILED PROJECT REPORT FOR REMOTE VILLAGE ELECTRIFICATION

 

Sl. No. Name of the Reports

I.         Hydro Power Technology

1

Electrification of Remote Hilly area Village Obra Gad (198 HH) in Distt. Uttarkashi. (Uttarakhand)

2

Electrification of Remote Plain - (Foot Hill) area Village Paro (180HH) in Distt. Lower Sabansiri, (Aruanchal Pradesh)

3

Electrification of Remote Hilly Area Village Patu (16 HH) in Distt. Lower Sabansiri, (Aruanchal Pradesh)

4

Electrification of Remote Hilly Area Village Khatwa (68 HH) in Distt. Dehradun, (Uttarakhand)

II.         Solar Photo Voltaic Technology

1

Electrification of Remote Hilly Area Village Magra (217 HH) in Distt. Udaipur, (Rajasthan)

2

Electrification of Remote Hilly Area Village Gavar Gaon (200 HH) in Distt. Raipur, (Chhatisgarh)

3

Electrification of Remote Hilly Area Village Ram Krishanpur (60 HH) in Distt. 24 South Pargana, (West Bengal)

4

Electrification of Remote Hilly Area Village Bafan Vihir (49 HH) in Distt. Nashik, (Maharashtra)

III.         Biomass

1

Electrification of Remote Hilly Area Village BOD (40 HH) in Distt. Betul, (MP)

2

Electrification of Remote Hilly Area Village Shikarpur (200 HH) in Distt. 24 North Pargana, (West Bengal)

3

Electrification of Remote Hilly Area Village Goriya Dih (61 HH) in Distt. Koderma, (Jharkhand)

4

Electrification of Remote Hilly Area Village Bhitri (145 HH) in Distt. Uttarkashi, (Uttarakhand)

2002 Alternate Hydro Energy Centre, All Rights Reserved. Terms and Conditions. Privacy Policy
Credits: The Web Team
E-Mail : emailto:ahec@iitr.ac.in and aheciitr@gmail.com