R&D / Monitoring Projects

S.No.

Title of the Project

Project Cost

(Rs. In lacs)

Funding Agency

Status of Project

1.

Development of Hydraulic Air Compressor

2.4

DST

Completed

2.

Study, Design & Modification of Pump as Turbine

9.0

DST

Completed

3.

Pilot Testing of Biomass Gasifier based electricity generation system 415 Kva rating

2.60

DNES

Completed

4.

Site Efficiency Measuring Equipment

5.0

DNES

Completed

5.

Appropriate Technology for Rural Development

3.0

SBI

Completed

6.

Appropriate Technology for Rural Technology

3.5

SBI

Completed

7.

Management Information System on Small Hydro Projects

Phase I

Phase II

 


5.1

5.0

 


DNES

MNES

 


Completed

Completed

8.

Centre for Hydro Energy

Phase I

Phase II

Phase III

 

10.0

4.0

1.0

 

MHRD

MHRD

AICTE

 

Completed

Completed

Completed

9.

Strengthening of Infrastructure Facilities Alternate Energy System

Phase II


10.0

0.5


MHRD

AICTE


Completed

Completed

10.

Strengthening of Infrastructural Facilities Modernisation AHEC Labs

1.0

MHRD

Completed

11.

Reinforced Earth

5.3

UPCST

Completed

12.

Post Commissioning Performance Evaluation of Micro Hydro Projects with Cross Flow Turbine

3.14

DST

Completed

13.

Training, Research & Consultancy

15.00

-do-

Completed

14.

Technology Selection

4.00

-do-

Completed

15.

Water Mills

7.00

-do-

Completed

16.

Renewable Energy Park

6.66

MNES

Completed

17.

Renewable Energy Tech.

3.00

AICTE

Completed

18.

Micro-processor Control for SHP

3.00

AICTE

Completed

19.

Monitoring of light weight portable sets implementation (50 Nos.)

20.0

MNES

Completed

20.

Pre-Investment Study for New Small Hydro Options

16.5

IREDA, New Delhi

Completed

21.

International Hydrological Programme of UNESCO Study CEH

5.01

DFID/CEH

Continued

22.

International Hydrological Programme of UNESCO Study CEH

3.24

DFID/CEH

Completed

23.

Dissemination of Regional Flow Regimes Estimation for Small Hydropower CEH, UK

10.85

DFID/CEH

Continued

24.

Monitoring of Demonstration Projects

7.5

MNES-HHP

Continued

25.

Water Mills Development

6.00

AICTE

Completed

26.

Design of Self Sustaining models for SHP

20.00

PFC

Completed

27.

Establishment of Cost benching for SHP

1.50

IREDA

Completed

28.

Strengthening of AHEC labs

14.50

AICTE

Completed

29.

Strengthening of AHEC

44.0

HHP-MNES

Completed

30.

Development of standard water mill in Uttaranchal

15.46

TIFAC, DST

Completed

31.

Consultancy Capability in SHP

4.0

DISR

Completed

32.

Strengthening of AHEC Library

16.50

MNES

Completed

33.

Strengthening of Testing Facility

16.50

HHP-MNES

Completed

34.

Establishing of Real Time Small Hydro Simulator

200.00

MNES

Under progress

35.

Strengthening of Infrastructure FIST

10.00

DST

Completed

36.

Strengthening of Infrastructure-Equipment

35.00

MHRD/IIT Roorkee

Completed

37.

Strengthening of Infrastructure-Civil & R&M Works

14.56

MHRD/IIT Roorkee

Completed

38.

Strengthening of Testing Facility

250.00

MNES, GoI

Under Progress

39.

MOU between UNDP-GEF Hilly Project

271.78

MNES

Completed

40.

Water for Welfare: An Uttaranchal Initiative setup as a Virtual Centre

32.00

Govt. of Uttaranchal

Under Progress

41.

Development of an Assessment System to Evaluate the Ecological Status of Rivers in the Hindu-Kush Himalayan Region

53.30

European Commission

Completed

42.

Kinetics of transesterification of vegetable oils for the production of biodiesel

12.00

MHRD

Completed

43.

Sectorial Overview Report on Hydropower Development in India

4.33

Royal Norwegian Embassy, New Delhi

Completed

44.

Syllabus for Leveraging the Rich Potential Available in Water Resources & Hydropower of Uttaranchal

17.46

UTEB, Govt of Uttranchal

Completed

45.

Unelectrified villages surveys, potential sources and electricity demand

28.00

UREDA

Completed

46.

Formulation of Policy for SHP in Assam

2.80

ASEB

Completed

47.

Cost Benching Marks of SHP

8.50

IREDA

Completed

48.

Dynamic Study of the Excitation and Transmission

3.50

SPC, Delhi

Completed

49.

Preparing the Manuals for Teachers in Water Resources/Hydropower Field

6.99

UA Tech. Education, Dehradun

Under Progress

50.

Establishing a Real Time Simulator for SHP Plants

294.00

MNRE and UNDP

Completed

51.

Renewable Energy for Rural Livelihood

100.86

MNRE and UNDP

On-going

52.

Enhancement of livelihood activities using existing SHP stations in Uttarakhand

80.50

MNRE and UNDP

On-going

TOTAL

1443.34 lacs

 

 